Asbestos Removal in Huntington Beach

At Huntington Beach Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Single-story ranch-style house with board-and-batten siding, a brick-veneer base and chimney, a low roof, a one-car garage and a wide front lawn under a pale sky.
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Entry with a wooden staircase and a textured ceiling, small square patches on the ceiling and wall, and sample bags and papers on the floor and bottom step.Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and a side window looking onto trees, and a doorway to a hall.

Asbestos testing and surveys

Sampling is done by a Cal/OSHA-certified asbestos consultant or technician who has EPA Building Inspector training, and the report records each sample, its place and its result. The South Coast Air Quality Management District’s rule requires that survey prior to any demolition or renovation, with a narrow exception for small single-unit jobs.

Popcorn ceiling removal

Ceiling texture may or may not contain asbestos, and only a lab result settles it. A positive sample leads to a removal plan built around the ceiling area and the paperwork that size of job calls for. New texture and paint come after the ceiling is done.

Kitchen floor of square vinyl tiles in a faded rose-beige pattern, with wooden cabinets, a white range and sunlight across the floor.Interior wall cut open around an electrical panel, with clear plastic taped around the opening and loose on the wood floor beside a window and an open door.

Floor tile and mastic removal

Mastic can hide under vinyl floor tile and sheet vinyl, and any of the three may contain asbestos. Under the district’s rule, floor tile (asphalt and vinyl included) and sheet vinyl are resilient floor covering once they hold more than 1 percent asbestos. The survey reaches every layer of flooring.

Drywall, joint compound and plaster removal

Opening a wall or ceiling in a remodel exposes drywall, joint compound and plaster. Sampling covers the wall and ceiling cavities as needed, and anything that tests positive is removed before the remodel crew cuts in.

Attic with silver-gray foil-wrapped round ducts along the rafters, plank flooring, loose insulation at the sides and light from a small vent window.Bathroom opened for a remodel, with a tub against bare wall framing, mosaic floor tile partly lifted, pink and teal wall tile and clear plastic hanging at the left.

HVAC duct and pipe insulation removal

The district counts installing or removing heating and air conditioning systems as renovation. Duct wrap, tape and pipe insulation may contain asbestos, so a furnace or duct change-out starts with samples, and we remove the material that tests positive.

Renovation and demolition abatement

Stripping or removing parts of a house is renovation, and taking out a load-supporting wall is demolition. Both call for a survey and a district notice no later than 10 working days before the work, with a narrow exception for small single-unit renovations.

Asbestos testing and removal costs

Nearly 7 in every 10 Huntington Beach homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Huntington Beach, Newport Beach and Costa Mesa. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

A Cal/OSHA-certified consultant takes the samples, a lab reports on each one, and you get a single written report of the materials tested, where they were and what came back. Clearance air testing after removal comes from a separate consultant.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

Plastic over the rooms, air filters running, the texture wetted and scraped into bags, then the haul and a cleanup. Patching, a new finish and paint come on top.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The area sealed off, tile or sheet vinyl lifted, the glue under it removed where it tested positive, bagged disposal and a cleanup. The new floor is not part of the price.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Containment and air filters, wall or ceiling material that tested positive taken out wet, bagged and hauled, and a cleanup. New drywall and paint are separate.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed area at the attic, furnace closet or pipe run, the positive wrap, tape or insulation removed and bagged, and a cleanup. New ducts and new insulation are priced separately.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

The materials that tested positive come out before the remodel or demolition crew starts, with containment, disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, positive stucco cut out wet, bagged and hauled, and a cleanup. New lath, stucco or siding is not included.

Get a free quote

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Pieces lifted off whole by hand and kept wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra, and roofing is priced after a roof visit.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Samples and a site visit

We start with a visit to see the work you have planned. Samples are taken by a Cal/OSHA-certified consultant or technician, and we plan the job from the lab report once it shows what was sampled and where.

02

The district notice and containment

Once removal is needed, the notice goes to the district through its online Rule 1403 Notification Web Application, together with the notification fee, since a notice without the fee is not counted as received. Containment goes up around the work area afterward.

03

Removal and the clearance test

Next the positive material comes out and the work area is cleaned. Clearance air testing then goes to a separate consultant, since California law bars contractors from clearance air monitoring.

The permit and asbestos disclosure form

Huntington Beach asks for a Permit & Asbestos Disclosure Form with alteration and demolition permits. Contractors and owner-builders both hand it in when the permit is issued, and the city’s demolition guidelines list it among the forms for a demolition.

The signature on that form is a promise to notify the district. That promise is kept when the Rule 1403 notice is on file before removal starts, which means no later than 10 working days before the work for a job that needs a notice.

The form also says a Certified Asbestos Consultant surveys the building if needed. For a renovation, the district’s rule decides that need, and the year the house was built does not. Rule 1403 sets no build-year cutoff.

For a demolition permit, state law as the district describes it also asks the applicant to give the building department a copy of the district notice.

To find out what applies where you live, start with the Huntington Beach building department. The district’s Asbestos Hot Line, (909) 396-2336, can also answer questions.

Homes from the 1960s and 1970s

Nearly 7 in every 10 Huntington Beach homes were built before 1980, and the middle home dates from 1974 or earlier. The 1960s and 1970s account for more than 6 in every 10 homes, while only about 2 in every 100 were built before 1950.

Among Huntington Beach homes, nearly 6 in every 10 are one-unit homes and more than 2 in every 10 sit in buildings of five or more units. Renters make up more than 4 in every 10 households.

The district’s small-job exceptions are written for single-unit dwellings, and apartment buildings, townhouses and condominiums are not single-unit dwellings under the rule. If you manage one, call us and we will go through what applies.

Ducts, attics and the HVAC change-out

A furnace or air conditioner replacement counts as renovation, because the district’s rule includes installing or removing heating, ventilation and air conditioning systems. For that job, the old duct wrap, tape and pipe insulation join the survey.

Wrap and tape can sit on attic duct runs, around the duct collar of a furnace closet or on wrapped pipes, so those are the places we ask the consultant to look.

Ask your heating and air contractor to leave room in the schedule for the survey and the district notice. We remove the insulation that tests positive, and your installer takes it from there.

Finding suspect material in the middle of a remodel

A remodel can turn up material nobody planned for, such as an older layer of flooring under the new one, ceiling texture above a dropped ceiling or wrapped pipe inside a wall.

The survey rule goes looking for exactly these hidden layers, since it reaches all layers of flooring materials to the joist level and the material in wall or ceiling cavities as necessary to sample it. A survey records what was sampled, where, and the result, so material that turns up outside those samples has not been tested yet.

If it happens on your job, call us and please do not take samples yourself. Once the lab result is in, we plan the removal around the area involved and the district notice.

Serving Huntington Beach, Newport Beach and Costa Mesa

We also serve Newport Beach and Costa Mesa. Call us for confirmation if your address is outside the area.

Frequently asked questions

Can I remove asbestos myself?

Only an owner who meets every condition, and only for renovation. The owner has to live in the house, which cannot be vacant, a rental or a business, and no laborers, friends or family members may do the work. That narrow exception in Rule 1403 covers an owner-occupant of a residential single-unit dwelling, never demolition, and waste deposited outside the house stays under the rule. South Coast AQMD advises against it anyway, citing a risk of asbestos exposure and of cross contamination. Please leave the sampling to a certified consultant.

What should I ask a removal company before I sign?

Ask for the company’s license number and confirm with the Contractors State License Board that it shows the C-22 Asbestos Abatement classification, or that its qualifier passed the asbestos certification exam. The state requires one or the other for asbestos-related work that involves 100 square feet or more of surface area of asbestos-containing material. For work of that size the company also needs a Cal/OSHA registration, which is valid for one year, so check its date as well as the company name.

What affects the cost of an asbestos job?

Several things move the price. Bigger areas, occupied buildings, second stories and extra air tests all add to it. Lab fees for the samples and the district notification fee come on top when a job needs them, because the district does not count a notice as received without the fee. Clearance air testing is its own cost, since a separate consultant runs it.

Does a small job still need a survey?

Only in one case. For a residential single-unit dwelling, the survey rule falls away when a renovation removes or strips less than 100 square feet of surface area of asbestos-containing material, and the notification and training rules do the same. Apartment buildings, townhouses and condominiums are not single-unit dwellings, demolition is never covered, and work practices and waste rules still apply. Testing is how you learn the amount.

Where does asbestos waste go?

A licensed hauler and a manifest carry friable waste away, since friable waste with 1 percent or more asbestos is California hazardous waste. The hauler’s manifest is the record you keep with your permit and disclosure form. California’s limits reach asbestos only in a friable, powdered or finely divided state, so nonfriable material is not caught, though other agencies may still restrict it.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 301-3488

Call (657) 301-3488